LandedCloud & Computing InfrastructureData Centre / Computing Facility2021SE-021

Chindata Group / Bridge Data Centres · Malaysia

Global South·Southeast Asia·Group: Chindata Group

How to read these numbers: A purposive, publicly sourced case library, not a probability sample: counts describe the library, not market share. Monetary figures mix investment, revenue and user metrics — treat them as magnitude markers and defer to the verbatim description and source link.

What happened

MY06 is the fourth hyperscale data-centre campus announced by Bridge Data Centres (per MIDA, 2021-12-02): approximately 40 acres, 100 MW of IT load, an investment of approximately RM2.5 billion over five years, three buildings, with Phase 1 in place by end-2022. It serves as the dedicated data centre anchored by ByteDance in Johor, Malaysia.

Localisation & innovation

PPVC prefabricated modules manufactured in China and rapidly assembled on-site, delivering the hyperscale facility in 314 days — an example of efficiency-oriented/frugal innovation.

Structured fields

Host country
Malaysia
Region
Southeast Asia
AI segment
Cloud & Computing Infrastructure
Entry mode
Data Centre / Computing Facility
Entry year
2021
Deployment status
Landed
Capital direction
China->host (outbound deployment)
Company group
Chindata Group

Local partner

ByteDance

GovernmentState-linked partner

Scale

MY06 is planned to have 110MW of IT power capacity and cover an area of 38 acres (company-disclosed).

Basis: company-disclosed

Sources & notes

Record note: RESOLVED: the MY06 code does not imply prior Malaysian sites specifically — MIDA (2021-12-02) states Bridge would operate '156+ MW of IT capacity across India and Malaysia', so the numbering spans a multi-country portfolio; no earlier named Malaysian site was verifiable. Keep the ownership caveat (Bain Capital control 2019–, privatisation 2023, Bridge DC operating HQ Singapore per MIDA). 2026-09-13 全库回扫复核(通过):回扫结论:PASS,deployment_status 保留 Landed、reliability 保留 High,均不降级。依据:原挂 4 条 URL 经复核员实测全属同一 PR 体系的企业来源——MIDA 2022/2021 为 MIDA+MDEC+BDC 联合通稿而 MIDA 已被本记录编为 local partner;W.Media 是 BDC 公关代理,13 段中 8 段与通稿 12 词窗口 100% 重合;bridgedatacentres.com 已 301 死链。复核员经 Wayback 补到两篇 DataCenterDynamics 具名报道(Dan Swinhoe 署名、无赞助标记、与通稿零逐字重合):2022-10-20 篇支撑设施已交付投运,2024-08-16 篇以现在时确认 ByteDance 为锚定租户,落地与高可靠因此成立。本次字段改动:补入该两条 DCD 存档来源,剔除死链 bridgedatacentres.com(裁定亦允许改标 dead)。档位未变故无恢复条件,但 PASS 以补挂 DCD 两条为前提,未补挂前不得视为已合规。裁定另列须执行项:拆 sources_total=5 / independent_sources=2、scale 拆为「已投运 19MW(MY06-1,2022-10 交付)/园区规划 110MW 三栋建设中」、partner_primary_type 停用 government 并重算派生字段、MIDA 的伙伴与官方来源两身份择一、description 末句改引 DCD 2024-08-16。

Compiled from public reporting and company disclosures. Not legal or investment advice — cite the source link alongside any quotation.

Related records

Other records in the same host country or AI segment, ranked by source reliability and year.

LandedSE-023
Cloud & Computing InfrastructureData Centre / Computing Facility2023

GDS launched its Nusajaya Tech Park (NTP) data-centre campus in Iskandar Puteri, Johor in August 2023. Phase 1 comprises NTP1, NTP2 and NTP3 with 22,500 sqm (242,200 sq ft) of net floor area and 69.5 MW of IT power; GDS acquired the land in July 2021 and broke ground in April 2022 (roughly 16 months to delivery, ahead of the originally planned 2024 date). GDS CEO William Huang described the campus as a catalyst for the region's journey towards a world-class AI computing hub. GDS's international business was spun off as DayOne at the start of 2025. In June 2025 DayOne signed a 21-year contract for up to 500 MW of solar power with Tenaga Nasional Berhad under Malaysia's Corporate Renewable Energy Supply Scheme (CRESS), covering Nusajaya Tech Park and Kempas Tech Park, whose combined data-centre capacity is 120 MW.

ByteDance

Malaysia·Southeast Asia

LandedSE-022
Cloud & Computing InfrastructureData Centre / Computing Facility2022

ByteDance established its presence in Malaysia as the anchor tenant of the BDC MY06 hyperscale data center at Sedenak Tech Park in Johor (commissioned in 2022), and subsequently announced an investment of approximately RM10 billion (about US$2.1 billion) to establish an AI center in Malaysia, together with a further approximately RM1.5 billion to expand its data center. According to disclosures by the Johor Menteri Besar (Chief Minister), ByteDance's cumulative investment in AI data centers in Malaysia has exceeded RM29.5 billion, making it a core investor in Johor's AI computing cluster.