已落地云与算力基础设施数据中心 / 算力设施2022 年SE-022

字节跳动(ByteDance) · 马来西亚(Malaysia)

全球南方·东南亚·集团:ByteDance

数据口径:本库为目的性编制的公开案例集,非概率抽样;计数仅描述本库构成,不代表市场份额。金额字段混合投资额/营收/用户数等口径,仅作量级参考,请以原文描述与来源链接为准。

部署描述

来源原文(英文,未经改写)

ByteDance established its presence in Malaysia as the anchor tenant of the BDC MY06 hyperscale data center at Sedenak Tech Park in Johor (commissioned in 2022), and subsequently announced an investment of approximately RM10 billion (about US$2.1 billion) to establish an AI center in Malaysia, together with a further approximately RM1.5 billion to expand its data center. According to disclosures by the Johor Menteri Besar (Chief Minister), ByteDance's cumulative investment in AI data centers in Malaysia has exceeded RM29.5 billion, making it a core investor in Johor's AI computing cluster.

本地化与创新要点

来源原文(英文,未经改写)

Relying on a Chinese-invested data center operator to rapidly deliver hyperscale computing capacity, positioning Johor as a Southeast Asian regional computing hub serving TikTok and AI operations.

结构化字段

东道国
马来西亚(Malaysia)
区域
东南亚
AI 赛道
云与算力基础设施
进入方式
数据中心 / 算力设施
进入年份
2022
落地状态
已落地
资本流向
中国 → 东道国(对外部署)
企业集团
ByteDance

本地伙伴

Bridge Data Centres

政府部门有国资 / 政府背景

规模

来源原文(英文,未经改写)

Cumulative investment exceeding RM29.5 billion (disclosed by the state government/media); of which the AI center plan is approximately RM10 billion ≈ US$2.13 billion (media reported).

口径:媒体估算量级标记:约 2,130,000,000 USD

金额字段混合投资额 / 营收 / 用户数等不同口径,仅可作量级参考,不可跨记录求和,请以上方原文与来源为准。

来源与备注

记录备注:来源原文(英文,未经改写)RESOLVED: the RM10 billion (US$2.13bn) AI-hub plan and the additional RM1.5 billion (US$317m) data-centre expansion were announced on 7 June 2024 by Malaysia's Investment, Trade and Industry Minister Tengku Zafrul Aziz after meeting TikTok VP Helena Lersch (Bernama/The Star/MIDA 2024-06-07; DCD 2024-06-10). The RM29.5bn cumulative figure is attributed to Johor Menteri Besar Datuk Onn Hafiz Ghazi (NST / Malay Mail, 2026-01-05).

本页内容整理自公开报道与企业披露,不构成法律意见或投资建议;对外引用时请连同来源链接一并给出。

相关记录

同一东道国或同一 AI 赛道的其他记录(按来源可靠度与年份排序)。

云与算力基础设施数据中心 / 算力设施2023 年
来源原文(英文,未经改写)

GDS launched its Nusajaya Tech Park (NTP) data-centre campus in Iskandar Puteri, Johor in August 2023. Phase 1 comprises NTP1, NTP2 and NTP3 with 22,500 sqm (242,200 sq ft) of net floor area and 69.5 MW of IT power; GDS acquired the land in July 2021 and broke ground in April 2022 (roughly 16 months to delivery, ahead of the originally planned 2024 date). GDS CEO William Huang described the campus as a catalyst for the region's journey towards a world-class AI computing hub. GDS's international business was spun off as DayOne at the start of 2025. In June 2025 DayOne signed a 21-year contract for up to 500 MW of solar power with Tenaga Nasional Berhad under Malaysia's Corporate Renewable Energy Supply Scheme (CRESS), covering Nusajaya Tech Park and Kempas Tech Park, whose combined data-centre capacity is 120 MW.

云与算力基础设施数据中心 / 算力设施2021 年
来源原文(英文,未经改写)

MY06 is the fourth hyperscale data-centre campus announced by Bridge Data Centres (per MIDA, 2021-12-02): approximately 40 acres, 100 MW of IT load, an investment of approximately RM2.5 billion over five years, three buildings, with Phase 1 in place by end-2022. It serves as the dedicated data centre anchored by ByteDance in Johor, Malaysia.