部署描述
来源原文(英文,未经改写)GDS launched its Nusajaya Tech Park (NTP) data-centre campus in Iskandar Puteri, Johor in August 2023. Phase 1 comprises NTP1, NTP2 and NTP3 with 22,500 sqm (242,200 sq ft) of net floor area and 69.5 MW of IT power; GDS acquired the land in July 2021 and broke ground in April 2022 (roughly 16 months to delivery, ahead of the originally planned 2024 date). GDS CEO William Huang described the campus as a catalyst for the region's journey towards a world-class AI computing hub. GDS's international business was spun off as DayOne at the start of 2025. In June 2025 DayOne signed a 21-year contract for up to 500 MW of solar power with Tenaga Nasional Berhad under Malaysia's Corporate Renewable Energy Supply Scheme (CRESS), covering Nusajaya Tech Park and Kempas Tech Park, whose combined data-centre capacity is 120 MW.
本地化与创新要点
来源原文(英文,未经改写)Overseas export of an intelligent Smart-DC construction-and-operations solution, achieving delivery in 14 months; a SIJORI cross-border hub model (Singapore connectivity + Johor land and energy + Batam expansion); a localized green-power-plus-energy-storage solution.
结构化字段
- 东道国
- 马来西亚(Malaysia)
- 区域
- 东南亚
- AI 赛道
- 云与算力基础设施
- 进入方式
- 数据中心 / 算力设施
- 进入年份
- 2023
- 落地状态
- 已落地
- 资本流向
- 中国 → 东道国(对外部署)
- 企业集团
- GDS / DayOne
本地伙伴
Nusajaya Tech Park
国有公用事业有国资 / 政府背景
规模
来源原文(英文,未经改写)Phase 1 (NTP1-NTP3): 22,500 sqm net floor area and 69.5MW IT power (DatacenterDynamics, 11 Aug 2023). Nusajaya Tech Park and Kempas Tech Park have a combined data center capacity of 120MW (DatacenterDynamics, 12 Jun 2025). DayOne closed a RM15bn (approximately US$3.5bn) multi-currency financing (SolarQuarter, 16 Jun 2025). The previous 'Phase 2 50MW' phase-two figure is removed: it appears in no source I could locate.
量级标记:约 3,500,000,000 USD
金额字段混合投资额 / 营收 / 用户数等不同口径,仅可作量级参考,不可跨记录求和,请以上方原文与来源为准。
来源与备注
记录备注:来源原文(英文,未经改写)GDS is Shanghai-headquartered (NASDAQ: GDS / HKEX: 9698). Its international business was spun off and rebranded as DayOne at the start of 2025 after a Series B round; GDS retains a 35.6% non-controlling stake (DatacenterDynamics, 12 Aug 2025), so the 'Chinese-capital origin' framing is correct, but DayOne is no longer a GDS subsidiary and should not be described as one. The originally cited GDS press-release URL (gds-services.com/en/newsshow_82.html) is dead — it returns 'Information not found!' and the item is absent from the GDS press-release index at gds-services.com/en/news_19.html — hence the source swap to the DatacenterDynamics report of the same launch. in_esg_report='Yes' could not be independently verified.
本页内容整理自公开报道与企业披露,不构成法律意见或投资建议;对外引用时请连同来源链接一并给出。